Go Over the Roller and Save!

Run DMC Over the Roller

As a transmission line construction specialist you analyze the costs associated with temporary joints used to pull through the rollers. The need for access roads or helicopters to install permanent splices can add $1,000,000 to your project for every 100 splices!

DMC Power's low-profile Swage design allows for splices to run OVER the roller during installation without impacting splice performance.

huwpz